Table of Contents


3  Reconstructing The I-94/I-69 Interchange

Reconstruction of approximately 3-¾ miles of freeway at the Interstate 94/Interstate 69 interchange in Port Huron
Township began in September 2013 and it will be completed in October.

5  Reconstructing Featherstone Road

An approximately 1-1/4-mile section of Featherstone Road between Opdyke Road and Squirrel Road in Auburn
Hills is being reconstructed with full depth 9-inch Michigan Department of Transportation (MDOT) P1 modified
concrete mix.

6  Municipal Exemption Targeted

Michigan Builder and Infrastructure magazine readers probably saw it on their television sets or tablets: boxes of
the Obama administration’s new fiscal budget being piled on tables in a government office building. If readers
thumb through the voluminous document, they will come across one proposal that will hit them on the head, like a
chunk of concrete falling from an overhead highway bridge.

6  From The Michigan Trenches…

7  Proposal 1 Needed For Roads

The May 5 Michigan ballot proposal that will increase funding for road construction in Michigan was the front and
center issue discussed at the Michigan Concrete Association 2015 Winter Conference/Workshop at the Inn at St.
John’s in Plymouth. The conference was held February 18-19.

15  The CAM 2015 Michigan Construction & Design Trade Show

20  News





Editorial and advertising inquiries should be directed to Aram Kalousdian, publisher/owner, Michigan Builder and
Infrastructure. Phone: (734) 481-3185. E-mail:
kalousdian@comcast.net.
2